Competitive Price for China Comaccord Hollow PP Concrete Slab Plastic Formwork for Construction Material 80-100 Times
“Based on domestic market and expand abroad business” is our enhancement strategy for Competitive Price for China Comaccord Hollow PP Concrete Slab Plastic Formwork for Construction Material 80-100 Times, We’re searching forward to forming prosperous organization marriage with new shoppers during the around long run!
“Based on domestic market and expand abroad business” is our enhancement strategy for Slab And Beam Formwork, Slab Edge Formwork, Slab Forming, Slab Formwork System, Slab On Grade Formwork, Slab Props, Slab Shuttering, Slab Shuttering Material, Slab Shuttering Work, We focus on providing service for our clients as a key element in strengthening our long-term relationships. Our continual availability of high grade items in combination with our excellent pre-sale and after-sales service ensures strong competitiveness in an increasingly globalized market.
Sr NO. |
Property |
Unit |
Test Method |
Value Of Test |
Result |
|
1 |
Moisture Content |
% |
EN 322 |
7.5 |
Check out |
|
2 |
Density |
kg/m3 |
EN 323 |
690 |
Check out |
|
3 |
Bonding Qality |
Bonding Qality |
Mpa |
EN 314 |
Max: 1.68 Min: 0.81 |
Check out |
Damage Rate |
% |
85% |
Check out |
|||
4 |
Bending Moudulus of Elasticity |
Longitudinal |
Mpa |
EN 310 |
6997 |
Check out |
Lateral |
6090 |
Check out |
||||
5 |
Longitudinal |
Mpa |
Mpa |
59 |
Check out |
|
Lateral |
43.77 |
Check out |
||||
6 |
Cycle Life |
About 15-25 Repeated Using Times Acoording To Projects By Formwork Application |
Sr NO. |
Property |
Unit |
Test Method |
Value Of Test |
Result |
|
1 |
Moisture Content |
% |
EN 322 |
8 |
Check out |
|
2 |
Density |
kg/m3 |
EN 323 |
605 |
Check out |
|
3 |
Bonding Qality |
Bonding Qality |
Mpa |
EN 314 |
Max: 1.59 Min: 0.79 |
Check out |
Damage Rate |
% |
82% |
Check out |
|||
4 |
Bending Moudulus of Elasticity |
Longitudinal |
Mpa |
EN 310 |
6030 |
Check out |
Lateral |
5450 |
Check out |
||||
5 |
Longitudinal |
Mpa |
Mpa |
57.33 |
Check out |
|
Lateral |
44.79 |
Check out |
||||
6 |
Cycle Life |
About 12-20 Repeated Using Times Acoording To Projects By Formwork Application |
Sr NO. |
Property |
Unit |
Test Method |
Value Of Test |
Result |
|
1 |
Moisture Content |
% |
EN 322 |
8.4 |
Check out |
|
2 |
Density |
kg/m3 |
EN 323 |
550 |
Check out |
|
3 |
Bonding Qality |
Bonding Qality |
Mpa |
EN 314 |
Max: 1.40 Min: 0.70 |
Check out |
Damage Rate |
% |
74% |
Check out |
|||
4 |
Bending Moudulus of Elasticity |
Longitudinal |
Mpa |
EN 310 |
5215 |
Check out |
Lateral |
4796 |
Check out |
||||
5 |
Longitudinal |
Mpa |
Mpa |
53.55 |
Check out |
|
Lateral |
43.68 |
Check out |
||||
6 |
Cycle Life |
About 9-15 Repeated Using Times Acoording To Projects By Formwork Application |
ROCPLEX Film faced plywood Save cost |
||
Be special for phenolic glue and film |
The film faced plywood can be disassembled and used repeatedly for both faces,saving 25% of the cost. |
|
Optimization for the special grade of core |
||
Be special for adhesive |
||
ROCPLEX Film faced plywood Shorten duration |
||
Excellent effect of demoulding |
Shorten 30% of the duration. |
|
Avoid the reconstruction of the wall |
||
Be easy to incise and blend |
||
ROCPLEX Film faced plywood the high quality of casting |
||
The flat and smooth faces |
The faces are flat and smooth, avoiding bleeding out remains of bubbles and concrete. |
|
The structure of waterproof and breathability |
||
The edges are polished carefully |
Container Type |
Pallets |
Volume |
Gross Weight |
Net Weight |
20 GP |
8 pallets |
22 CBM |
13000KGS |
12500KGS |
40 HQ |
18 pallets |
53 CBM |
27500KGS |
28000KGS |
Meanwhile we also can supply you the formwork systerm accessories, commercial plywood , film faced plywood etc.
We specially professional in supplying antislip plywood.
Please contact our sales team for more detailed information regarding chinese film faced plywood.
“Based on domestic market and expand abroad business” is our enhancement strategy for Competitive Price for China Comaccord Hollow PP Concrete Slab Plastic Formwork for Construction Material 80-100 Times, We’re searching forward to forming prosperous organization marriage with new shoppers during the around long run!
Competitive Price for China Plastic Formwork, Construction Plastic Formwork, We focus on providing service for our clients as a key element in strengthening our long-term relationships. Our continual availability of high grade items in combination with our excellent pre-sale and after-sales service ensures strong competitiveness in an increasingly globalized market.